目次
T.Gogami
S.Kanatsuki
K.Takenaka
Next meeting
参加者:
永江
後神
金築
竹中
T.Gogami
Report about J-PARC business trip
Preparation and install a calibration source for Ge detector was done.
The source consists of W sticks which contain 2& Th.
PTR
TOF frame
Doing drawing CAD –> Quote
Beam time expects to be started on 3/8 in the earliest case.
S.Kanatsuki
Report about J-PARC business trip
K.Takenaka
Water Cherenkov detector → Requesting quote
Master's thesis is in progress.
Next meeting
2015/2/6 13:00-