このページの2つのバージョン間の差分を表示します。
|
s-2s_meeting_20150107 [2015/01/13 02:25] gogami 作成 |
s-2s_meeting_20150107 [2015/03/03 04:31] (現在) gogami |
||
|---|---|---|---|
| 行 1: | 行 1: | ||
| - | S-2S meeting summary (2015_01_07) | + | 参加者: |
| - | 参加者: 永江、後神、金築、竹中、加藤 | + | * 永江 |
| + | * 後神 | ||
| + | * 金築 | ||
| + | * 竹中 | ||
| + | * 加藤 | ||
| - | T.Gogami | + | ===== T.Gogami |
| - | → gogami_S-2Smeeting_20140107 | + | gogami_S-2Smeeting_20140107.pdf : [[http:// |
| - | | + | * What to do in 2015 |
| - | E13 experiment | + | |
| - | Preparation and experiment (in 2015/Feb?): Gogami, Kanatsuki | + | * Preparation and experiment (in 2015/Feb?): Gogami, Kanatsuki |
| - | Pilot E05 experiment (Autumn in 2015?) | + | |
| - | Depends on E13 experiment. | + | *Depends on E13 experiment. |
| - | Detector preparation | + | *Detector preparation |
| - | LAC, PVAC/LC/new WC, etc. | + | *LAC, PVAC/LC/new WC, etc. |
| - | E05 experiment (2016~) | + | |
| - | Frame design: TOF and WC | + | *Frame design: TOF and WC |
| - | Actual WC detector design | + | *Actual WC detector design |
| - | Detector construction: | + | *Detector construction: |
| - | Mente Carlo simulation: | + | *Mente Carlo simulation: |
| - | Yield, retes, detector setup optimization, | + | *Yield, retes, detector setup optimization, |
| - | Magnets | + | *Magnets |
| - | D magnet construction (~Feb in 2015? | + | |
| - | TOSCA calculation → magnetic field map (→ backward transfer matrix optimization) | + | |
| - | CAD drawing: TOF frame and actual WC | + | |
| - | S.Kanatsuki | + | ===== S.Kanatsuki |
| - | | + | |
| - | Report about works and situation at J-PARC in last month | + | * Report about works and situation at J-PARC in last month |
| - | DC Repairing was done. | + | |
| - | PVAC: | + | |
| - | Development will be finished in a few months by E07 group. | + | *Development will be finished in a few months by E07 group. |
| - | | + | would be used for E05 pilot experiment in Autumn, 2015. |
| - | Trigger: | + | |
| - | Changing from E13 to E05 pilot experiment does not seem difficult. | + | * Changing from E13 to E05 pilot experiment does not seem difficult. |
| - | Removing iron: | + | |
| - | expects to be done for a few days. | + | * expects to be done for a few days. |
| - | K.Takenaka | + | ===== K.Takenaka |
| + | *Water Cherenkov detector test with cosmic ray | ||
| + | *UVT acrylic window test with a grease which has a high UV transmission is in progress. | ||
| + | *Reproducibility due to attachment way: NPE +/- ~3 | ||
| + | *Writing Master' | ||
| - | Water Cherenkov detector test with cosmic ray | ||
| - | UVT acrylic window test with a grease which has a high UV transmission is in progress. | ||
| - | Reproducibility due to attachment way: NPE +/- ~3 | ||
| - | Writing Master' | ||
| + | ===== K.Kato ===== | ||
| + | * Old E15 data analysis for practice (TOF resolution etc.) | ||
| + | * will go to J-PARC from 1/13. | ||
| - | K.Kato | ||
| - | Old E15 data analysis for practice (TOF resolution etc.) | ||
| - | will go to J-PARC from 1/13. | ||
| - | + | ===== Money ===== | |
| - | + | ||
| - | Money | + | |
| Total: ~200 | Total: ~200 | ||
| - | + | * Actual WC × 1(30) | |
| - | | + | |
| - | TOF frame (120) | + | |
| - | Trip (50) | + | |
| - | Next meeting | + | ===== Next meeting |
| 2015/1/13 10:00- ? | 2015/1/13 10:00- ? | ||