このページの2つのバージョン間の差分を表示します。
s-2s_meeting_20150107 [2015/01/13 02:25] gogami 作成 |
s-2s_meeting_20150107 [2015/03/03 04:31] (現在) gogami |
||
---|---|---|---|
行 1: | 行 1: | ||
- | S-2S meeting summary (2015_01_07) | + | 参加者: |
- | 参加者: 永江、後神、金築、竹中、加藤 | + | * 永江 |
+ | * 後神 | ||
+ | * 金築 | ||
+ | * 竹中 | ||
+ | * 加藤 | ||
- | T.Gogami | + | ===== T.Gogami |
- | → gogami_S-2Smeeting_20140107 | + | gogami_S-2Smeeting_20140107.pdf : [[http:// |
- | | + | * What to do in 2015 |
- | E13 experiment | + | |
- | Preparation and experiment (in 2015/Feb?): Gogami, Kanatsuki | + | * Preparation and experiment (in 2015/Feb?): Gogami, Kanatsuki |
- | Pilot E05 experiment (Autumn in 2015?) | + | |
- | Depends on E13 experiment. | + | *Depends on E13 experiment. |
- | Detector preparation | + | *Detector preparation |
- | LAC, PVAC/LC/new WC, etc. | + | *LAC, PVAC/LC/new WC, etc. |
- | E05 experiment (2016~) | + | |
- | Frame design: TOF and WC | + | *Frame design: TOF and WC |
- | Actual WC detector design | + | *Actual WC detector design |
- | Detector construction: | + | *Detector construction: |
- | Mente Carlo simulation: | + | *Mente Carlo simulation: |
- | Yield, retes, detector setup optimization, | + | *Yield, retes, detector setup optimization, |
- | Magnets | + | *Magnets |
- | D magnet construction (~Feb in 2015? | + | |
- | TOSCA calculation → magnetic field map (→ backward transfer matrix optimization) | + | |
- | CAD drawing: TOF frame and actual WC | + | |
- | S.Kanatsuki | + | ===== S.Kanatsuki |
- | | + | |
- | Report about works and situation at J-PARC in last month | + | * Report about works and situation at J-PARC in last month |
- | DC Repairing was done. | + | |
- | PVAC: | + | |
- | Development will be finished in a few months by E07 group. | + | *Development will be finished in a few months by E07 group. |
- | | + | would be used for E05 pilot experiment in Autumn, 2015. |
- | Trigger: | + | |
- | Changing from E13 to E05 pilot experiment does not seem difficult. | + | * Changing from E13 to E05 pilot experiment does not seem difficult. |
- | Removing iron: | + | |
- | expects to be done for a few days. | + | * expects to be done for a few days. |
- | K.Takenaka | + | ===== K.Takenaka |
+ | *Water Cherenkov detector test with cosmic ray | ||
+ | *UVT acrylic window test with a grease which has a high UV transmission is in progress. | ||
+ | *Reproducibility due to attachment way: NPE +/- ~3 | ||
+ | *Writing Master' | ||
- | Water Cherenkov detector test with cosmic ray | ||
- | UVT acrylic window test with a grease which has a high UV transmission is in progress. | ||
- | Reproducibility due to attachment way: NPE +/- ~3 | ||
- | Writing Master' | ||
+ | ===== K.Kato ===== | ||
+ | * Old E15 data analysis for practice (TOF resolution etc.) | ||
+ | * will go to J-PARC from 1/13. | ||
- | K.Kato | ||
- | Old E15 data analysis for practice (TOF resolution etc.) | ||
- | will go to J-PARC from 1/13. | ||
- | + | ===== Money ===== | |
- | + | ||
- | Money | + | |
Total: ~200 | Total: ~200 | ||
- | + | * Actual WC × 1(30) | |
- | | + | |
- | TOF frame (120) | + | |
- | Trip (50) | + | |
- | Next meeting | + | ===== Next meeting |
2015/1/13 10:00- ? | 2015/1/13 10:00- ? |