s-2s_meeting_20150107

参加者:

  • 永江
  • 後神
  • 金築
  • 竹中
  • 加藤

T.Gogami

gogami_S-2Smeeting_20140107.pdf : click here

  • What to do in 2015
    • E13 experiment
      • Preparation and experiment (in 2015/Feb?): Gogami, Kanatsuki
    • Pilot E05 experiment (Autumn in 2015?)
      • Depends on E13 experiment.
      • Detector preparation
      • LAC, PVAC/LC/new WC, etc.
    • E05 experiment (2016~)
      • Frame design: TOF and WC
      • Actual WC detector design
      • Detector construction: WC and TOF
      • Mente Carlo simulation:
      • Yield, retes, detector setup optimization, opotics, calibration method etc.
      • Magnets
        • D magnet construction (~Feb in 2015?) –> Field measurement (May in 2015?)
        • TOSCA calculation → magnetic field map (–> backward transfer matrix optimization)
    • CAD drawing: TOF frame and actual WC

S.Kanatsuki

  • Geant4 simulation of WC: redoing
  • Report about works and situation at J-PARC in last month
    • DC Repairing was done.
    • PVAC:
      • Development will be finished in a few months by E07 group.

would be used for E05 pilot experiment in Autumn, 2015.

  • Trigger:
    • Changing from E13 to E05 pilot experiment does not seem difficult.
  • Removing iron:
    • expects to be done for a few days.

K.Takenaka

  • Water Cherenkov detector test with cosmic ray
    • UVT acrylic window test with a grease which has a high UV transmission is in progress.
    • Reproducibility due to attachment way: NPE +/- ~3
  • Writing Master's thesis.

K.Kato

  • Old E15 data analysis for practice (TOF resolution etc.)
  • will go to J-PARC from 1/13.

Money

Total: ~200

  • Actual WC × 1(30)
  • TOF frame (120)
  • Trip (50)

Next meeting

2015/1/13 10:00- ?