内容へ移動
S-2S Wiki
ユーザ用ツール
ログイン
サイト用ツール
検索
ツール
文書の表示
以前のリビジョン
バックリンク
最近の変更
メディアマネージャー
サイトマップ
ログイン
>
最近の変更
メディアマネージャー
サイトマップ
現在位置:
top
»
s-2s_meeting_20140827
トレース:
s-2s_meeting_20140827
この文書は読取専用です。文書のソースを閲覧することは可能ですが、変更はできません。もし変更したい場合は管理者に連絡してください。
====後神==== {{:gogami_s-2smeeting_2014_8_27_.pdf|pdf file}} * Missing mass resolution simulation with CH<sub>2</sub> target * Effect of Ξ<sup>-</sup> and decayed particles from Ξ<sup>-</sup> on the energy loss correction of missing mass. --> Correction seems to be impossible. * will start designing WC detectors, and frame of WC and TOF detectors. ====金築==== {{:stsmeeting140827.pptx|pptxファイル}} * S-2S official web page was updated. * S-2S Wiki: * Edit can be done by only core members (Nagae, Gogami, Kanatsuki, Takenaka) so far. * Acceptance map for generation points (x,y and z) around target region were shown as histograms. * Momentum resolution with drift chambers (simulation) * No wires: FWHM = 5.5 × 10<sup>-4</sup> * W plate (0.1 μm) : FWHM = 5.7 × 10<sup>-4</sup> (thought to be realistic case) * W plate (1 μm): FWHM = 6.3 × 10<sup>-4</sup> (comparable level to the case with fiber detector) * W plate (10 μm): FWHM = 12 × 10<sup>-4</sup> * About SDC2: *If SDC2 is used with rotation of 90 degrees, x-position resolution is deteriorated (σ<sub>x</sub> = 0.2 mm → 1.1 mm). --> Δp/p = 7.7 × 10<sup>-4</sup> (This result is worse than that of our intuition. Need to be checked.) * Required sizes for drift chambers: * SDC1: 75 × 125 mm<sup>2</sup> * SDC2: 95 × 240 mm<sup>2</sup> * SDC3: 800 × 400 mm<sup>2</sup> * SDC4: 920 × 550 mm<sup>2</sup> * Detector lists * Schedule for preparation ====竹中==== * Analyses of data of prototype WC detector, which were taken at ELPH * x,y-position dependence were shown. * Position dependences were smaller than those of Geant4 simulatin. --> will use the Geant4 simulation by himself with Kanatsuki-kun's support. * Preparation for presentations in Atagawa and Hawai meeting. * Rough overview will be prepared by next week. ====その他==== * Indian summer school in Prague, Czech Republic (9/3 - 9/7) * Next S-2S regular meeting: TBD ( 9/16(火) 10:30- ? ) * Workshops at Atagawa (9/23-25) (9/25-27)
s-2s_meeting_20140827.txt
· 最終更新: 2018/09/25 02:04 by
kanatsuki
ページ用ツール
文書の表示
以前のリビジョン
バックリンク
文書の先頭へ