S-2S meeting summary (2015_01_07) 参加者: 永江、後神、金築、竹中、加藤
T.Gogami → gogami_S-2Smeeting_20140107 (.pptx) (.pdf)
What to do in 2015
E13 experiment
Preparation and experiment (in 2015/Feb?): Gogami, Kanatsuki
Pilot E05 experiment (Autumn in 2015?)
Depends on E13 experiment.
Detector preparation
LAC, PVAC/LC/new WC, etc.
E05 experiment (2016~)
Frame design: TOF and WC
Actual WC detector design
Detector construction: WC and TOF
Mente Carlo simulation:
Yield, retes, detector setup optimization, opotics, calibration method etc.
Magnets
D magnet construction (~Feb in 2015?) → Field measurement (May in 2015?)
TOSCA calculation → magnetic field map (→ backward transfer matrix optimization)
CAD drawing: TOF frame and actual WC
S.Kanatsuki
Geant4 simulation of WC: redoing
Report about works and situation at J-PARC in last month
DC Repairing was done.
PVAC:
Development will be finished in a few months by E07 group.
→ would be used for E05 pilot experiment in Autumn, 2015.
Trigger:
Changing from E13 to E05 pilot experiment does not seem difficult.
Removing iron:
expects to be done for a few days.
K.Takenaka
Water Cherenkov detector test with cosmic ray
UVT acrylic window test with a grease which has a high UV transmission is in progress.
Reproducibility due to attachment way: NPE +/- ~3
Writing Master's thesis.
K.Kato
Old E15 data analysis for practice (TOF resolution etc.) will go to J-PARC from 1/13.
Money Total: ~200
Actual WC × 1(30) TOF frame (120) Trip (50)
Next meeting 2015/1/13 10:00- ?