ユーザ用ツール

サイト用ツール


s-2s_meeting_20150126

参加者:

  • 永江
  • 後神
  • 金築
  • 竹中

T.Gogami

  • Report about J-PARC business trip
    • Preparation and install a calibration source for Ge detector was done.
    • The source consists of W sticks which contain 2& Th.
    • PTR
  • TOF frame
    • Doing drawing CAD –> Quote
  • Beam time expects to be started on 3/8 in the earliest case.

S.Kanatsuki

  • Report about J-PARC business trip

K.Takenaka

  • Water Cherenkov detector → Requesting quote
  • Master's thesis is in progress.

Next meeting

2015/2/6 13:00-

s-2s_meeting_20150126.txt · 最終更新: 2015/03/03 04:33 by gogami